In working with the Washington DC area office of UBuildIt we are adding a 1800 square foot addition to our Colonial home. We will be posting updates and comments on our progress as we go along. I hope you enjoy the journey with us.

Friday, July 13, 2007

The Basement #3

The waterproofing and drainage system has been added to the outside of the foundation. You can see that the windows openings are complete. The next step is to prepare the slab.

A view of the outside of the long wall.

A panoramic of the basement from above.


A panoramic from the side.

Posted by Arlington Addition at 12:23 PM

0 comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

LINKS

  • UBuildIt-Bethesda

Blog Archive (click the year to update)

  • ▼  2007 (34)
    • ►  October (6)
      • More BRICK Work!
      • The BRICKS have arrived.
      • Here's a Closer Look at the Front Porch
      • Let's Start on the Roof
      • Time for Fascia, Eves, and Cornise Work
      • Inside the Addition...
    • ►  September (3)
      • Let's Start Framing!
      • The Front Porch is Taking Shape
      • More Framing Pictures
    • ►  August (1)
      • The Roof Trusses are on site!
    • ▼  July (14)
      • Framing Has Begun!
      • The Lumber is On-site
      • The Boom
      • The Basement has been Poured!
      • Ready to Pour the Basement Slab!
      • The Basement Walls are UP
      • The Basement #3
      • The Basement #2
      • The Basement is Taking Shape
      • Supplies for Basement Walls
      • Pouring Cement for the Footers
      • More Pictures of the Big Rigs
      • The Cement Rigs Arrive on Site
      • Digging Day #5
    • ►  June (10)
      • Digging Day #4
      • Digging Day #3
      • Digging Day #2
      • Digging Day #1
      • Demolition Day 3
      • Demolition Day 2
      • Demolition Day 1
      • Prep for Demolition
      • The "BEFORE" Picture
      • The Backyard!